Additional project details

D2 Build, a premium general contractor in Toronto, recently completed a stunning main floor interior renovation in the vibrant Danforth area.

Main Gut Interior Renovation In The Danforth

D2 Build, a premium general contractor in Toronto, recently completed a stunning main floor interior renovation in the vibrant Danforth area. This home renovation featured structural enhancements, full mechanical upgrades (including plumbing, electrical, and HVAC), and essential framing adjustments for improved insulation. The interior remodel transformed the home beautifully, showcasing exceptional craftsmanship, highlighting meticulous attention to detail, quality workmanship from an experienced general contractor, and compliance with modern building standards.

Scope of Work

Main Floor Interior Remodel

  • Demolition: Removed most of the main floor, including the existing kitchen, counters, partition wall, and the entire powder room bathroom.
  • Interior: Inspected and confirmed structural integrity of the home’s double-wythe brick walls in Toronto’s Danforth community. Addressed interior double-wythe brick wall construction, which was originally strapped using 1×3 lumber without insulation prior to installing drywall for this interior renovation.
  • Ceiling: Reinforced second-floor joists pocketed directly into brick walls. Determined interior walls as non-load bearing. Provided structural reinforcement using laminated veneer lumber (LVLs) and joist hangers around stair openings.
  • Flooring: Installed new hardwood flooring in living, dining, kitchen, front, and side entrances to complete interior renovation.
  • Trim & Molding: Added baseboards and shoe molding throughout interior remodel.Tiling: Upgraded bathroom flooring with new tiles.

Before

Process

After

Kitchen Renovation

  • Maintained Open-Concept: Removed the partition wall to create an open-concept design for this kitchen renovation.
  • HVAC & Mechanical: Mechanical components passed inspection—plumbing, electrical, and HVAC (heating, ventilation, air conditioning). Electrical approval by ESA (Electrical Safety Authority) obtained prior to drywall installation for the kitchen remodel. Completed ductwork for exhaust fan. The electrician installed electrical plugs; the plumber installed sink and faucets, finalizing the mechanical phase.
  • High-End Features:
    • New cupboards and countertops on both sides of wall
    • Premium appliances, including fridge and sink, and stove.
  • Plumbing Upgrades: Updated plumbing infrastructure to support new fixtures and appliances.

Bathroom Remodel

  • Complete Overhaul: Fully renovated bathroom powder room designed with elegant and durable features for lasting appeal and performance.
  • Tiling Installation: The finished tile installation showcased tiles on both the walls and the floors. While the visual finish is sleek and attractive, the preparation beneath the tiles is even more critical for ensuring long-lasting durability.
  • Waterproofing the Walls: Prior to tile placement, walls were prepped using Schluter’s Kerdi Board—a distinctive, orange-coloured, half-inch-thick waterproof board. This board completely wraps the walls to ensure full waterproof protection. Even if water were to penetrate the tile grout or seams, the Kerdi Board guarantees that moisture will not infiltrate the interior wall structure.
  • Waterproofing the Floor: Floor tile installation began with the placement of Schluter’s Ditra membrane. This specialized wafer-patterned membrane sits beneath the tile, providing slight flexibility to accommodate minor movement in the flooring. Most importantly, Ditra creates a robust waterproof barrier, preventing water from seeping through the tiles and damaging the subfloor underneath.
  • New Fixtures for Main Floor Powder Room: Upgraded fixtures installed to modernize and enhance both functionality and aesthetics, complementing the renovated bathroom space.
Bathroom Remodel
Interior Waterproofing - Unfinished Basement

Interior Waterproofing - Unfinished Basement

  • Basement Demolition: Removed existing basement walls and flooring damaged by mold and water.
  • Trench Excavation: Cut a 12-inch perimeter trench around the interior basement foundation.
  • Waterproofing System Installation: Installed weeping tile drainage system within the trench. Filled trench with gravel to facilitate water drainage. Applied Delta board membrane to foundation walls to block moisture.
  • Concrete Restoration: Poured fresh concrete to seal the trench and restore the basement floor.
  • Sump Pump Setup & Drainage: Installed sump pit and pump to collect water from the weeping tile system. Routed discharge pipes from sump pump to backyard, safely directing water away from home.

The Interior Remodel’s Result: A Beautiful, Modern, Ready To Live-In Home

This Danforth interior renovation transformed a dated main floor into a modern, open-concept living space that seamlessly blends style with structural integrity. D2 Build’s expert craftsmanship, meticulous waterproofing, high-quality finishes, and adherence to rigorous building standards delivered not only aesthetic excellence but also long-lasting comfort, durability, and enhanced home value.